KWIZDA

During the construction of civil engineering works at the Kwizda plant in Leobendorf STCE has performed the vibrations measurements at the noise barrier wall of the S1, in the factory and at residents on behalf of Porr.

Client

Porr Bau GmbH

Services

  • Vibration measurmeents during Civil engineering works

Project

Kwizda Leobendorf

Type

  • Vibration
  • Monitoring