In the pedestrian zone of Linz the residents should be protected from vibrations of city trams. Therefore the tracks will be stored elastic. STCE was commissioned by the Linz AG with an initial test of the system at a test site, with the prognosis calculations and quality assurance measurements before and after conversion. Particularly challenging was the different types of buildings from the 17th century to modern glass / steel structures.