S36 Murtal Speedway

The S 36 Murtal Speedway road runs from St. Michael in Upper Styria (A9/S6) Judenburg to Scheifling (S 37). Of the approximately 59 kilometers Speedway are currently around 38 km in operation, this is the route to St.Michael - Judenburg. Closing the gap between St. Georgen ob Judenburg to Scheifling was begun in May 2013. STCE was commissioned by the ASFiNAG to control the vibration measurements from the construction company.

Client

ASFINAG Bau Management GmbH

Services

Control of Vibration measurements

Project

S36 Murtal Speedway St.Georgen-Scheifling 

Type

  • Environment
  • Vibration
  • Control