The S 36 Murtal Speedway road runs from St. Michael in Upper Styria (A9/S6) Judenburg to Scheifling (S 37). Of the approximately 59 kilometers Speedway are currently around 38 km in operation, this is the route to St.Michael - Judenburg. Closing the gap between St. Georgen ob Judenburg to Scheifling was begun in May 2013. STCE was commissioned by the ASFiNAG to control the vibration measurements from the construction company.
